亚洲av片不卡无码久久,国产成人久久精品一区二区三区,人妻av综合天堂一区,男人用嘴添女人私密视频

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
亚洲 日韩 欧美 成人 在线观看| 67194熟妇人妻欧美日韩| 欧美性猛交xxxx黑人| 久久精品国产99国产精品导航| 躁躁躁日日躁| 醉酒后少妇被疯狂内射视频| 久久成人国产精品免费软件| 国语少妇高潮对白在线| 八区精品色欲人妻综合网| 国产成人综合久久亚洲精品| 青娱乐极品视觉盛宴国产视频| 国产精品国色综合久久| 真实国产乱啪福利露脸| 亚洲a无码综合a国产av中文| 纯爱无遮挡h肉动漫在线播放| 亚洲欧美成人一区二区在线电影| 无套内谢孕妇毛片免费看看| 免费午夜爽爽爽www视频十八禁| 欧美+成+人嘿咻在线视频| 成年女人免费v片| 国产精品久久久久久吹潮| 国产精品日本一区二区在线播放| 好吊妞视频这里有精品| 美女扒开内裤让男生桶 | 亚洲日韩乱码中文无码蜜桃臀| 成人无码精品1区2区3区免费看| 亚洲成av人片一区二区三区| 久久久久久久综合色一本| 婷婷五月深深久久精品| 精品人人妻人人澡人人爽牛牛| 国产精品美女一区二区三区| 精品一区二区三区在线观看| 中文字幕无码乱人伦| 男人和女人做爽爽视频| 国产成人精品白浆久久69| 亚洲国产精品sss在线观看av| 亚洲精品国产精品国自产观看| 亚洲欧美成人一区二区在线电影| 精品性高朝久久久久久久| 久久人人妻人人做人人爽| 免费久久人人爽人人爽av|